Past Projects

Pipestone has performed various tasks on the behalf of pipeline and facility owners, engineering firms and pipeline construction contractors over the past 5 years. Depending upon the projects requirements, some of Pipestone’s contracts have included the development of detailed construction execution plans, schedules, construction management, cost estimates and bid packages.

Click here for  a pdf version.

Pacific Trails Pipeline (PTP)

Pipestone produced construction plans and the cost estimate on behalf of a pipeline construction contractor. Pipestone performed construction management on behalf of the clearing contractor.

Coastal Gas Link Project (CGL)

Pipestone produced construction plans and cost estimates on behalf of a successful pipeline construction contractor. Pipestone Projects is currently supporting this contractor in the field and home office in various capacities.

Trans Mountain Expansion Project (TMEP)

Pipestone produced detailed cost estimates on behalf of the owner and assisted with labour strategy.  In addition, Pipestone is also performing commercial and technical evaluation on successful pipeline construction contractor proposals.

Eagle Mountain- Woodfibre LNG Pipeline

Pipestone produced construction execution plans and detailed cost estimates on behalf of a project engineering firm.

Steelhead LNG Pipeline

Pipestone evaluated various routing options for this project including rock volume analysis and high-level cost estimates on behalf of the owner.

Alaska LNG Project (AK LNG)

Pipestone provided a cost estimate analysis and review.

Enhance Energy Alberta Carbon Trunk Line (ACTL)

Pipestone developed a construction execution plan and a cost estimate on behalf of a pipeline construction contractor.

Tidewater Pioneer Pipeline Project

Pipestone completed route refinement and developed a construction execution and cost estimate on behalf of the owner.

Access Pipeline

Pipestone produced a construction cost estimate for the owner on behalf of an engineering company.

Alberta Natural Gas Liquids Pipeline (ANGLe)

Pipestone developed a construction cost estimate plan, construction execution plan, and schedule on behalf of one of the owner partners.

Shell Scottford

Pipestone produced a construction execution plan and a cost estimate for an engineering company on behalf of the owner.

Gran Tierra Energy – Columbia Pipeline

Pipestone produced a feasibility study and a cost estimate for an engineering company on behalf of the owner.

Papua New Guinea

Pipestone produced a cost estimate as part as a feasibility study for an engineering company on behalf of the owner.

Gas Interconnection Poland

Pipestone developed a project execution plan on behalf of a pipeline construction contractor.

Pembina Smokey Area Development

Pipestone produced a cost estimate and multiple construction schedules.

Gran Tierra Pommoroso Pipeline Project

Pipestone developed a detailed construction execution plan and cost estimate.

Pattullo Bridge Replacement Project

Pipestone generated a proof of concept cost estimation, and scheduling options report for the project.

Nexen K1A Pipeline Replacement Project

Pipestone produced a cost estimate, risk analysis, construction estimate, and schedule.

Shell LNG Groundbirch

Pipestone developed a cost estimate, risk analysis, scheduling options.

Gazoduq Natural Gas Line Project

Pipestone delivered detailed cost estimate and schedule for a natural gas line, and compression and metering facilities.

CGL Wilde Lake Compressor Station

Pipestone developed construction plans and cost estimates collaborating with facility construction contractor to be approved for Phase II CGL Compression projects.

Nexen Aurora Project

Pipestone developed route evaluations and construction estimate for a large diameter LNG pipeline from North East B.C. to Prince Rupert.

Numerous Small Pipeline and Facility Projects Since February 2013, Pipestone has developed numerous pipeline cost estimates, desktop and in-field planning exercises and scheduling for smaller pipeline projects. Additionally, Pipestone has supplied personnel to assist with compressor station and pump station cost estimates on behalf of our clients bidding work for TransCanada and Enbridge